In the mid of 2009, WIKA together with other companies  have succeded in completing the Suramadu Bridge, a prestigious project  that connects Java and Madura islands. Currently the project have been  enjoyed by the community at large. Entering 2010, WIKA is faced with a changing business environment with  greater challenges. 
Lead Electrical Engineer
- Male
 - S1 Electrical (reputable university)
 - Having 3-5 years work experiences in Power Plant Project
 - Experience in Power Plant is preference
 - Familiar with Panel, Cable, Tray, Trafo, Ups, etc, Bulk Material
 - Familiar with related Code & Standard (IEC, ANSI, IEEE, NEC), Equipment Sizing (MCC, SWGR, TRANSFORMER, EDG, UPS, DC System), System Study, Data Sheet
 - Has experience in design, installation, pre-com/commissioning and start-up electrical equipment for power plant.
 - Familiar with electrical engineering software such as ETAP
 
- Male
 - S1 Chemical Engineering (reputable university)
 - Min 3-5 years work experiences
 - Experience in Power Plant Project is preference
 - Familiar with related Code & Std, Process Description, PFD, PID, Material & Heat Balace, Thermodinamic, Process Control Philosophy, Operating Phylosophi. Preferable understood Precomm & Comm
 - Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant.
 
- Male
 - S1 Electrical / Instrument / Engineering Physics (reputable university)
 - Min 3-5 years work experiences
 - Experience in Power Plant Project is preference
 - Familiar with related Code and std (ISA, API, ASTM, ASME) PLC, DCS, SCADA, Field Instrument, Loop Diagram, Hook Up
 - Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant
 
- Male
 - S1 Electrical (reputable university)
 - Min 6 years work experiences
 - Experience in Power Plant is preference
 - Familiar with electrical engineering code & standard for Power Plant application
 - Has experience in design, installation, pre-com/commissioning and start-up electrical equipment for power plant.
 - Familiar with electrical engineering software such as ETAP
 
- Male
 - S1 Engineering Physics (reputable university)
 - Min 6 years work experiences
 - Experience in Power Plant Project is preference
 - Familiar with Instrument & Control engineering code & standard for Power Plant application
 - Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant
 
- Male
 - S1 Mechanical (reputable university)
 - Minimum 5 years experience as Mechanical Engineer of Designing, Maintenance or Construction in power plant project
 - Advance knowledge in pump and pumping and skill in Hydraulic calculation & thermodynamic
 - Applied knowledge of mechanic of material and machine elements & Project Management
 - Basic knowledge of safety environment (LOTO, permit system, lifting, rigging, scaffolding, fire protection, hydrocarbon management, etc)
 - Basic knowledge of material & welding inspection
 - Understand well with API, ANSI, ASTM, ASME
 - Understand well with other design and construction of process facilities modification, upgrade, or new design
 - Understand well with pipe stress analysis, Caesar & Fluid flow and modeling software
 
- Male
 - S1 Electrical / Mechanical (reputable university)
 - Min 4 years work experiences
 - Experience in Power Plant Project is preference
 - Has experience in installation, inspection & test, pre-commissioning, and commissioning for power plant.
 - Familiar with code and standard for site inspection and test electrical equipments for power plant application.
 - Familiar with site inspection & test, pre-com/commissioning report procedure
 
- Ready for remote area
 - Working under pressure
 - Fluently in English
 - Microsoft Office / Open Office (Microsoft word, Microsoft excel, Microsoft Project, Microsoft Power Point)
 

