PT Kaltim Prima Coal (KPC) operates a coal mine in Sangatta East Kalimantan and is one of the largest export coal mines in the world. Opportunity exists for a seasoned, high caliber, professional to join the Company with job assignment in Sengata-East Kalimantan for the position of:
Project Engineer - Control System (Code: PEC) - Kalimantan Timur
Responsibilities
- Part of project team to onitiate and developing the project plan and determine key priorities
- Provide technical advice and deliver service consistent with time, quality, environment and safety parameters and contribute to the overall success of the projects
- Identity potential problems and riks and develops contigency/mitigation plans. Oversees implementation of the project plan and monitors progress
- Liaise and intensive communication with customer, controctors, consultants and KPC personnel for electrical, control system and related projects requirements
- Ensure that all services and projects undertaken meet technical specification, standard and project management practise
- Demostrate commitment to HSE and meeting the requirements of Prima Nirbhaya
- Perform key priorities deteminded in the section's annual plan. Contribute in achieving section's budget plan and work priorities to provide efficient, effective customer service and identification of strength and opportunity
Requirements
- Posses S1 in Electrical / Control System Engineering with at least 3 years in electrical/control system engineering of relevant mining/industry experiences
- Possess extensive experiences and proven skills in running service/operation/maintenance and production facilities in the mining or industry, preferably involving remote or develop locations
- Have an understanding of how to manage projects, including engineering, procurement and construction of fixed plant's electrical and control systems
- Use experience accumulated in the current or similiar roles to demostrate a capability to think across others
- Good interpersonal and communication skills both in Bahasa Indonesia and English
- Good knowledge pf KPC's HSE policies, procedures and standards
- Closing date: July 29, 2011
Responsibilities
Key elements of the position include:
Key elements of the position include:
- Conduct pit slope stability analysis using available software.
- Understand and implement the procedures outline in the field procedural manual.
- Liaise with the drilling supervisor regarding execution of the Geotechnical drilling program.
- Gather field and laboratory data to be processed for further Geotechnical assessment work.
- Together with Mining Engineer and pit supervisor conducted regular pit inspection
- Ensure day by day the mining activity follow geotechnical recommendation and assist in planning further modification of the current pit design.
- Gathers geotechnical monitoring data; interpreted the result and inform to pit supervisor any indication of instability.
- Supervise geotechnical laboratory activity and ensure test procedure applied at all time.
- Maintain geotechnical database.
Requirements
Qualifications & Experience:
Qualifications & Experience:
- Geotechnical / Engineering Geology or Mining Engineering or Civil Engineering graduate with 1 to 3 years in mining operation experience.
- Previous exploration experience would be advantage
- Basic knowledge and understanding of rock properties.
- Initiative in all aspects of the profession.
- General computers skills such as MS Windows, Excel & Word.
- Good interpersonal and communication skills (written & oral) in both bahasa Indonesia and English.
- Commitment to KPC safety and environment regulations.
- Working knowledge of geotechnical software is preferable.
- Closing date: July 25, 2011
<< Start < Prev 1 2 3 Next > End >>